The Lantern (2)

This is very much an exercise for me, so I went for a simple form based on an already existing pattern

Front Pane

For the remainder of the lantern I used glass which I already had in my collection, a deep purple coloured glass.

The lantern taped together

It is clear to me that the wooden casing is going to be the make or break for this project. Which I will finish at Le Gallaudec Marquetrie.

Fiona’s Tulip Lamp (First Impressions )

But what will my choice of glass and the choices within that glass give, how will the different colours marry? I used available glass in my stock for flower stems and borders.

I fitted up the first cut and found section on a light table, remembering that this only approaches the impression given on a finished lamp.

Can’t wait to see the finished lamp, I’m pretty sure the flowers work.

First Section assembled on mold

So after a long pause to manufacture the Peacock lamp, here I am back on the Wisteria shade, with the first section tacked onto the mold. There are a few pieces that need trimming down and re-coppering, (just waiting to finish my boxes supporting my veneer work to once again free up the workshop).

As this lamp is terribly time consuming and repetitive, I will probably start a much simpler lamp after the second repeat section.

The Peacock Lamp finished

20th October till 20th January and the Peacock lamp is now finished! My photos don’t bring out the full depth of colour, but there you go.

There were a number of difficulties to overcome, the first was the lack of availability of a brass upper ring or its support ring.

As I had already thought about strengthening the lower edge of the Wisteria lamp that is already underway I had purchased several meters of tin coated copper braid from Tressage du Dorlay, 3mm inner diameter, 6mm outer diameter. This was considerably cheaper than the brass ring (2.37€/meter as opposed to 49€) and formed easily around the finished opening after demolding. After soldering in place and coating the surface with solder, this gave a clean round form to the lampshade upper opening.

Tin coated copper braid

The 76mm support ring was replaced by a 140mm tin coated ring which I soldered in place on the lamp inner surface at 6 different locations. This too was considerably cheaper ( 7€ instead of 114€).

The Peacock Lamp First view of the lamp after demolding

So how does the actual lamp compare with the sectors placed on the light box? Rushing to try to finish for Xmas, and not quite making it, I de-molded easily after 30 mins at 95C and mounted it carefully on an existing lamp stand.

The light table doesn’t show the colours as bright as they are. So just remains to mount a spider, solder the inside of the lamp, solder a braided ring at the top of the lamp, finish solder the outside surface, treat the outside with a patina and generally clean and tidy the lamp.

The Peacock Lamp First Repeat Section

Here we are with the first of eight repeats almost finihed, I’ll swap out number 51 in blue for better blended in green/yellow blue colour. The glass colours chosen are: WISSMACH 703 WO Mystic blue purple white for the top, then bleu vert et opaline WO 197 et vert claire et opaline WO 57 et orange et opaline KO 112 from Stefatelier, Verre « Youghiogheny » bleu cobalt ambre et opaline, Vert et Jaune Chamarré from GK Terchniques

A reminder of the sketched out colour ideas

Why only work on One lamp when you can work on two

So my cousin Nicola asked me if I would make a lamp for her and after a little research on the internet she said that this one looked nice, but maybe a little smaller than this 27 inch lamp, so we went for the 16 inch version which I sketched out for glass colours

So of we go, I’ll do this one at the same time as the Wisteria!

First Section finished

So here is the first section on the light table, I’ve identified 8 to 10 pieces that would be better in cobalt blue from 329 to 307 and 199, otherwise the effect is what I was looking for.

The next step is to check each piece individually to ensure no clashes at the final assembly after coppering and also to ensure the numbers are still readable, could take maybe 25 hours, then onto the first repeat.

Let’s Accelerate

Not a lot happened in May and June, my last two weeks as a bona fide worker, with retirement comes a little more time. So here is the work so far on the light box.

I hope to finish this 1/5th this week then I can do the last adjustments before coppering. I think I will slightly increase the blue on the other faces and maybe change a few colours here.